大桥未久av一区二区三区中文_亚洲综合在线播放_国产精品偷乱一区二区三区_亚洲国语精品自产拍在线观看

當(dāng)前位置:首頁 >> 企業(yè)年報 >>內(nèi)容詳細(xì)

Tri-Tech Holding:Fiscal Year 2012 Financial Results

2013-10-14 16:55:24  

Tri-Tech Holding Reports Fiscal Year 2012 Financial Results

Date:04/01/2013

BEIJING, April 1, 2012 -- Tri-Tech Holding Inc. (Nasdaq: TRIT), which provides turn-key water resources management, water and wastewater treatment, industrial safety and pollution control solutions, announced its financial performance for fiscal year ended December 31, 2012. Highlights include the following:

 

  • In 2012, Total Revenues declined by 15.4% to $72.6 million compared to $85.9 million in FY 2011.
    • Revenue from the Water, Wastewater Treatment and Municipal Infrastructure ("WWTM") declined by 55.3% to $26.0 million from $58.1 million;
    • Revenue from the Water Resource Management System and Engineering Service ("WRME") increased by 72.6% to$22.3 million from $12.9 million; and,
    • Revenue from Industrial Pollution Control and Safety ("IPCS") increased by 64.2% to $24.3 million from $14.8 million;
  • In 2012, Gross Profit declined by 19.9% to $17.5 million compared to $21.9 million in FY 2011. Gross Margin dropped to 24.1% from 25.5% from a year ago.
  • Income From Operations declined to a loss of $0.8 million compared to a gain of $10.7 million from a year ago.
  • Net Income declined to a loss of $2.3 million compared to a gain of $8.1 million in 2011.
  • Weighted average number of diluted shares outstanding was 8,211,089 compared to 8,238,291 from FY2011.
  • Diluted Earnings Per Share was a loss of $0.28 compared to a gain of $0.98 from 2011.

Mr. Gavin Cheng, CEO of Tri-Tech Holding Inc. commented, "Overall, we experienced deteriorations in our fiscal 2012 operating results compared with that of 2011. Despite a noteworthy increase in sales in both the WRME and IPCS segments, we sustained significant reduction in sales in WWTM segment which hindered our performances. The reduction was partially due to our decision to avoid Build & Transfer projects to ease cash pressures. The deviation led us to focus on Engineering Procurement & Construction ("EPC") projects which usually feature a lower profit margin compared to that of BT projects. Furthermore, we saw delays in implementation in major projects in the WWTM segment which further impacted our revenues.

Our gross margin overall dropped by about 1percentage point, but our operating related expenses grew by 64.7%. These expenses increased because we increased headcount to compete for more business early in the year. As we encountered challenges in the WWTM segment, we shifted expenditures to grow revenues in the WRME and IPCS segments.

To address the underlying reasons believed to cause the loss, we have taken the following steps:

  • Streamline the corporate structure to increase the operating efficiency;
  • Recalibrate sales related strategies and budget management based on profitability analysis; and,
  • Enforce project implementation related methods and cost management.

In 2013 we plan to devote our energy to:

  • Manage our cash flows by increasing oversight of capital-sensitive projects to improve our cash position;
  • Align the Company with established partners in the WWTM segment to maintain competitiveness and to fuel a sustained growth; and,
  • Improve our gross margin especially in WWTM and WRME segment through perfected marking strategies.

With our devotions to a better environment, we believe our business benefits people in millions and our industry continues to thrive. While invigorating our strength, we shall dynamically act upon presented opportunities by exploring business endeavors with creativities. As always, we are devoted to grow the company to its potentials."

FY2012 Financial Performance Metrics

Revenue

The 15.4% decrease in revenues noted above is primarily attributable to a significant decrease in the system integration revenues, from $82,401,473 for the year ended December 31, 2011 to $67,961,198 in 2012. Although the Company increased revenues in two of its three operating segments, the decrease in WWTM revenues overshadowed those increases.

Gross Margin

The gross margin decrease noted above is a result of several factors, including increases in material and equipment costs and labor subcontracting costs. The rapid expansion into overseas market also had a direct impact on the increase of cost of sales. These factors all contributed to the lower gross margin.

Total Operating Expenses

The Company's total operating expenses increased to $18,310,880 in the year ended December 31, 2012 from $11,116,205 in the same period of 2011, an increase of 64.7%. The increase is attributable to increased selling and marketing expenses and general and administration expenses. Research and development expenses decreased from $179,396 in 2011 to $174,726 in 2012.

  • Selling and Marketing Expenses
    Selling and marketing expenses increased from $2,164,363 in the year ended December 31, 2011 to $4,148,861 in the same period of 2012, an increase of 91.7%. Increased sales staff headcount elevated the total amount of every related expense such as travel expenses, compensation-related expenses, and entertainment expenses.
  • General and Administrative Expenses
    General and administrative expenses consist primarily of compensation costs, rental expenses, professional fees, and other overhead expenses. General and administrative expenses increased from $8,772,446 in 2011 to $13,987,293 in 2012, an increase of 59.4% largely due to significant increases in salary expenses, transnational professional fees as we have expended internationally and amortization and depreciation expenses.

    General and administrative expenses for 2012 and 2011 took up approximately 19.3% and 10.2% of total revenues, respectively.

Loss before Income Taxes

In the year ended December 31, 2012, the Company's net loss before provision for income taxes was $943,457, a decrease of 108.8% compared to income $10,729,428 in 2011. The Company's provision for income taxes decreased by 7.7%, from$1,958,864 in 2011 to $1,808,415 in 2012. The decrease in income taxes for 2012 was primarily caused as some subsidiaries experienced losses from ordinary business operations. In the year ended December 31, 2012, net loss attributable to the shareholders of TRIT was $2,264,074, a decrease of 128.0%, from income of $8,088,374 for the year ended December 31, 2011.

Net loss and EPS

Diluted EPS was a loss of $0.28, based on net loss of $2.3 million and 8,211,089 weighted average of diluted shares outstanding for the year ended December 31, 2012, compared to earnings of $0.98 in 2011, based on net income of $8.1 million and 8,238,291 weighted average diluted shares outstanding.

Liquidity and Capital Resources

As highlighted in the consolidated statements of cash flows, the Company's liquidity and available capital resources are impacted by four key components: (i) cash and cash equivalents, (ii) operating activities, (iii) financing activities and (iv) investing activities.

Cash and Cash Equivalents

The Company's cash and cash equivalents of $8,098,657 at December 31, 2012 decreased by 32.1%, from $11,935,746 onDecember 31, 2011, mainly due to rapid overseas expansion and the implementation of the current projects. The current portion of restricted cash as of December 31, 2012 and 2011 amounted to $5,283,541 and $2,087,920, respectively, which is not included in the total of cash and cash equivalents. The restricted cash was on deposit as collateral for the issuance of letters of credit for project financing. Our subsidiaries that own the deposits do not have material cash obligations to any third parties. Therefore, the restriction does not impact the liquidity of the Company.

Operating Activities

Net cash used for operating activities was $20,254,517 in the year ended December 31, 2012, compared with that of$24,418,947 in same period of 2011. The decrease of 17.1% in operating cash outflow was mainly due to the new acquired bank borrowings and corporate bond to fund the Company's operations in 2012. Net accounts receivable increased from$19,888,084 on December 31, 2011 to $18,598,110 on December 31, 2012, a decrease of 6.5%. Current unbilled receivables increased from $7,254,830 on December 31, 2011 to $27,954,525 on December 31, 2012, an increase of 285.3%, mainly from the Company's increasing BT projects and several overseas projects. The remaining portion was mainly due to the decreased inventory and prepayments to suppliers, due to the total revenue decline.

Investing Activities

Net cash used for investing activities was $1,381,911 in the year ended December 31, 2012, compared to $3,563,836 in the same period of 2011. Currently we have no further plan to add capital expenditure on the construction of Baoding as it is close to completion.

Financing Activities

The cash provided by financing activities was $18,138,246 in 2012, compared to $17,152,767 in the same period of 2011. The increase was due to increased bank borrowings and the corporate bond issued in September 2012.

Effect of Change in Exchange Rate Changes on Cash and Cash Equivalents

Net cash loss due to currency exchange was $338,906 in the year ended December 31, 2012, compared to a loss of $629,233in the same period of 2011.

Restricted Net Assets

As of December 31, 2012 and 2011, restricted retained earnings were $2,246,910 and $1,866,994, respectively, and restricted net assets were $4,878,975 and $4,553,729, respectively. The unrestricted retained earnings as of December 31, 2012 and 2011 were $17,038,396 and $19,682,386, respectively, which were the amounts ultimately available for distribution if we were to pay dividends.

Working Capital and Cash Flow Management

As of December 31, 2012, the Company's working capital was $17,923,637, with current assets totaling $83,042,716 and current liabilities totaling $65,119,079. Of the current assets, cash and cash equivalents were $13,382,198.

Recent Business Updates and Development

Domestic Market

By the end of 2012, the initial phase of the Ordos project was 97.5% completed and started trial operation. The expansion phase, which was awarded in June 2011 was 90% complete.

In January 2012, we secured a Build-Transfer contract for the construction of a wastewater treatment plant and a wastewater pipeline network in Dawangdian Industrial Park in Xushui County, Hebei Province. The project was one of our initiatives in the industrial wastewater treatment sector in China. To implement the project, we established a project company in Xushui County. We have completed the major construction and most of the equipment purchasing. The Xushui project contributed more than 13.8% of revenues during 2012.

Overseas Market

The wastewater treatment plant projects in Bihar India contributed 13.2% of revenues during 2012. Although dealing with a delay in implementation, we have already completed the design and redesign per client's request, land preparation and a portion of equipment purchasing.

Order Backlog and Pipelines

The Company's backlog represents the amount of contract work remaining to be completed, that is, revenues from existing contracts and work in progress expected to be recognized in current period, based on the assumption that these projects will be completed on time according to the project schedules.

The following table provides backlog by segment as of December 31, 2012, in comparison to that of December 31, 2011. The percentage of change shows how much of our backlog became revenue in 2012. Backlog decreased significantly in Segments 1 and 2 and moderately in Segment 3. This reflects both (i) the recognition of revenue in projects in Segments 1 and 2 in 2012 and (ii) that such recognized revenues were not replaced with an equivalent amount of new projects in such Segments. Based on remaining backlog, we expect much higher revenues in Segment 1 than in Segments 2 or 3 in 2013.

 

December 31, 2012

December 31, 2011

 

USD Million

% of Total Backlog

USD Million

% of Total Backlog

Segment 1 (WWTM):

38.7

64.4%

63.1

66.8%

Segment 2 (WRME):

6.7

11.1%

16.1

17.0%

Segment 3 (IPCS):

14.7

24.5%

15.3

16.2%

Total

60.1

100.0%

94.5

100.0%

Pipeline represents the values of projects we have been actively pursuing. Our pipeline as of December 31, 2012 was $50.7 million in Segment 1, $2.5 million in Segment 2 and $34.8 million in Segment 3.

Having a dynamic nature, the value of projects moves from pipeline into backlog when we secure the project and from backlog to revenue based on percentage of completion.

會員驗證

提交關(guān)閉

成人亚洲欧美激情在线电影| 欧美性猛交99久久久久99 | 少妇高清精品毛片在线视频| 国产欧美自拍| 91网站在线看| 国产高清一级毛片在线不卡| 久久久国产精品免费| 欧洲毛片视频| 6080午夜不卡| 天天干视频在线| 一区二区三区在线免费观看| 在线观看亚洲天堂| 从欧美一区二区三区| 少妇人妻好深好紧精品无码| 国产欧美在线| 亚洲图色中文字幕| 日韩大片在线播放| 国产91xxx| 久久久久观看| 91社在线播放| 亚洲欧洲二区| 欧美二区在线| 都市激情亚洲一区| 亚洲最大的免费| 老司机福利在线视频| 2019中文字幕免费视频| 依依成人在线| 欧美乱妇高清无乱码| 91传媒在线观看| 夜夜嗨av一区二区三区免费区| 涩涩视频免费观看| 日韩一区二区电影在线| 影音日韩av| 欧美性大战久久| 亚洲美女色视频| 欧美性猛交xxxx| 成人久久精品人妻一区二区三区| 亚洲激情中文1区| 影音先锋国产资源| 亚洲欧洲日韩在线| 天天做天天爱夜夜爽| 91免费小视频| 国产黄色片视频| 99精品视频免费在线观看| 精品国产视频在线观看| 国产呦萝稀缺另类资源| 婷婷综合在线视频| 激情综合亚洲精品| 国产黄色片在线| 国产精品自拍三区| www.av免费| 国产成人av电影在线观看| 欧美风情第一页| 国产精品一级在线| 中日韩一级黄色片| 成人激情小说乱人伦| 少妇久久久久久被弄高潮| 成人高清av在线| 久久精品www人人爽人人| 91视视频在线直接观看在线看网页在线看| 久久高清无码视频| 久久久久久久久一| 日本视频在线观看免费| 国产精品二三区| 在线观看毛片视频| 亚洲综合在线五月| 亚洲精品一区二区三区新线路| 欧美日韩精品二区| 亚洲一卡2卡三卡4卡2021四卡| 91久久精品网| 欧美日韩亚洲国内综合网| 日韩免费电影网站| www天堂在线观看| 色综合伊人色综合网站| 宅男午夜视频| 羞羞色国产精品| 日韩精品黄色| 91在线视频成人| 亚洲啊v在线| 欧美日韩在线播放一区二区| 国产精品一区免费在线| 韩国无码av片在线观看网站| 久久91精品| 午夜两性免费视频| 亚洲国产精品第一区二区| xxxx黄色片| 国产做a爰片久久毛片| 日本青青草视频| 国产女主播视频一区二区| 在线观看免费中文字幕| 亚洲一线二线三线视频| 人人妻人人玩人人澡人人爽| 欧美亚洲动漫精品| 九色资源网91| 国产亚洲a∨片在线观看| 中文字幕第12页| 国产91精品视频在线观看| 成人在线影视| 久久久久久九九九九| 国产亚洲久久| 欧美,日韩,国产在线| 亚洲欧美偷拍自拍| 午夜一区二区三区免费| 国产成人一区二区精品非洲| 精品人妻无码一区二区性色| 亚洲综合免费观看高清完整版| 色欲av永久无码精品无码蜜桃| 欧美精品乱码久久久久久| 黄色动漫网站| 欧美国产视频一区二区| 粗大黑人巨茎大战欧美成人| 欧美精品一区二区三区在线四季| 另类在线视频| 色啦啦av综合| 蜜臂av日日欢夜夜爽一区| 欧美日韩大片在线观看| 综合久久久久久| 先锋影音男人| 亚洲美女视频网站| 伪装者免费全集在线观看| 成人精品一区二区三区电影黑人| 中老年在线免费视频| 亚洲色婷婷久久精品av蜜桃| 999久久久精品国产| 亚洲色图14p| 99精品一区二区三区| 国产高清不卡视频| 日韩一级视频免费观看在线| 嫩草影院在线观看网站成人| 57pao精品| xxx欧美xxx| 国产精品videossex国产高清| 91精品久久久久久久蜜月| 亚洲av综合一区二区| 久久亚洲春色中文字幕久久久| av免费在线不卡| 欧美v亚洲v综合ⅴ国产v| 国产午夜视频| 成人伊人精品色xxxx视频| 欧美欧美在线| 污污网站在线观看视频| 经典三级在线一区| 最近中文字幕在线观看| 欧美日韩国产综合久久| 97干com| 国产精品自产拍在线观看| 国产精品一区二区美女视频免费看| 超碰在线97免费| 蜜臀91精品一区二区三区| 无码视频在线观看| 欧美唯美清纯偷拍| 国产精品影视| 2020国产精品久久精品不卡| 999久久久久久久久6666| 熟妇无码乱子成人精品| 丁香另类激情小说| 亚洲av无码乱码国产麻豆| 亚洲激情电影中文字幕| 川上优的av在线一区二区| 日韩高清在线播放| 中文乱码免费一区二区三区下载| 日本二区三区视频| 亚洲一区二区高清| 黄色免费视频观看| 国产精品久久久久久久久久ktv| 99综合久久| 青娱乐国产精品视频| 久久综合色之久久综合| 五十路亲子中出中文字幕| 日韩一区二区欧美| www.综合| www.亚洲天堂网| 韩国精品免费视频| 精品久久久久中文慕人妻| 亚洲欧洲午夜一线一品| www视频在线免费观看| 久久香蕉视频网站| 日本欧美一区二区在线观看| 91亚洲国产成人精品一区| 亚洲国产精品推荐| 国产日产一区二区三区| 激情五月六月婷婷| 欧美aaa在线| 国产成人毛毛毛片| 亚洲最大在线视频| caoporn视频在线观看| 欧美三级午夜理伦三级| 岛国一区二区三区| 午夜国产在线视频| 欧美成年人视频| 懂色aⅴ精品一区二区三区| 在线免费观看av网| 国产三级欧美三级| 在线观看制服搞黄视频| 国产精品三级久久久久久电影| 美女视频亚洲色图| 久久免费手机视频| 日韩欧美成人网| 中文字幕中文字幕在线中文字幕三区| 国产一区二区精品免费|